1. STRUCTURE FOUNDATIONS.
The structure will be reinforced concrete. Foundations will be of reinforced concrete individual pad footings.
All in accordance with the structural analysis and the drawings of the house.
2. ROOF.
The roof will be a reinforced concrete slab. Asphaltic water insulation provided. Acoustic and thermo
insulation also.
3. WALLS.
Brick walls 20 cm and 10 cm thick in accordance with the drawings. High quality brick will be used.
Internal surfaces will be emulsion paint on plaster.
External surfaces will be sprits on plaster.
4. KITCHEN WALLS.
Surfaces between kitchen benches and wall cupboards will receive coloured ceramic tiles.
All other surfaces will be emulsion painted on plaster.
Value of ceramic tiles CYP 10.00/ m2.
5. BATHROOM AND TOILET WALLS.
All surfaces will receive coloured ceramic tiles to 210 cm high from the finished floor level.
Value of ceramic tiles will be CYP 10.00/m2.
6. FLOOR FINISHES.
6.1. Bedrooms: Ceramic tiles - Value CYP 6.00/m2
6.2. Bathroom and toilets: Ceramic tiles - Value CYP 10.00/m2
6.3. Living, Dining Rooms: Ceramic tiles - Value CYP 6.00/m2
6.4. Verandas: Ceramic tiles- Value CYP 6.00/m2
6.5. Kitchen: Ceramic tiles - Value CYP 6.00/m2
6.6. Inside stairs: Marble / ceramic - Value CYP 15.00/m2
7. DOORS AND WINDOWS.
7.1. Entrance door will be solid timber with frame of softwood timber.
7.2. All internal doors will be flush doors with MDF and frame of softwood timber.
7.3. All handles will be brass.
7.4. All windows and external doors will be double glazed coloured aluminium with panes.
8. BEDROOM CUPBOARDS.
Internal partitions will be of melamine. Externally MDF doors will be used.
9. KITCHEN BENCHES.
9.1. Internal partitions will be of melamine.
9.2. Externally MDF.
9.3. Top will be made of vinyl cover.
9.4. Double bowl single-drainer acrylic sink will be used.
10. SANITARY FITTINGS.
Sanitary fittings and units in accordance with the drawings.
All sanitary units will be of good quality and in accordance with British Standards:
1. Bathtub - CYP 100.00
2. Hand basin - CYP 60.00
3. WC - CYP 80.00
4. Bathroom mirror - CYP 20.00
5. Shower
11. ELECTRICAL INSTALLATION.
Electrical installation will be done according to the drawings and approved by E.A.C.
Provision for A/C will be installed in living room and every bedroom.
12. PLUMBING INSTALLATION.
Plumbing and drainage installation will be done in accordance with the drawings.
PVC pipes will be used for cold and hot water supply. Hot water pipes will be properly insulated.
CPVC pipes will be used for drainage.
A 30 gallon solar water heater will be installed.
13. PAINTING.
13.1. All internal walls will be painted with emulsion paint.
13.2. All ceilings will be emulsion painted.
13.3. All timber surfaces will be painted white 14.
SEWAGE DISPOSAL.
Septic tank and absorption pit will be constructed and made operative in accordance with the drawings.
Connection with the central sewage system when it will be operational.
15. ADDITIONAL FEATURES.
15.1. Full Air Conditioning
15.2. Installation of a fridge, and a washing machine.
15.3. Installation of a hob, oven and extractor fan.
15.4. Pressurised hot and cold water system.15.5 Granite kitchen work top.
16. EXTERNAL: WORKS.
16.1. A fencing wall is to be constructed.
16.2. A common Swimming Pool will be constructed as drawings.
16.3. Tiling around swimming pool as drawings16.4. Electronic security gates.
16.5. Children’s swimming pool.
16.6. Fully A/C, professionally equipped exercise GYM.16.7.
Children’s Playground. |